Main phases of repair works in the apartment.
How to start repair works of the apartment?
The very first stage of the repair work of old apartments is the damage and dismantling firstly of the worn out walls and partition walls, getting rid of the wall and ceiling finish. This phase is one of the most "dirty" phases of the repair work.
One more amongst the most crucial and "dirty" works is the window block replacement. It is required to do this to start with due to the fact that dirt and dust will be unallowable during following stages and it is restricted at all to open windows during painting and wallpaper works (big drops of the temperature and wetness are unallowable). After installing windows and windowsills it is required to load them instantly in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to avoid scratches).
The following phase is electrical wiring. Circuitry can be installed in walls or along the floor. Wiring is made inside the pipelines to make sure electrical safety and increase dependability. The pipeline secures circuitry from external damages and enables to replace the wire completely without breaking walls and floor merely by placing the brand-new wire instead of the old one.
House Painting follows the wiring. The regular mistake during the synchronised conducting of such works happens when employees forget to lay out one of the cable televisions and home painters have currently plastered and ravelled the wall. As an outcome, additional works are needed to seal chases on the finished wall. The locations of the feed switch and wall outlet place and their number should be thought-out in advance. The plan of power electrical wiring is normally included into the style project.
Later on the system must be ready to service in case of failures. In addition to the wirings, the telephone cable and the TV cable are set out. The power cable television need to not be laid out near the telephone and antenna cables to prevent noise pickup and interference. The most strange moment is setting out the TV cable. In order to make 2 (or 3) television set in the home the second cable is frequently just "strongly soldered" in parallel, so the cable television resistance is lowered. As a result, the display screen quality is deteriorated, numerous programs can't be received and etc. In order to prevent such circumstance it is required to invite a specialist with special devices. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-term procedure, that is why it is carried out at the same time in all facilities, if it is possible. Delays are related to the innovation. Each used layer of the plaster (or completing finishing) should dry completely before the work will continue.
Works in sanitary plans and the kitchen area start all at once with house painting. It is better to fulfill so-called "filthy" works in the top place and all at once. In accordance with the strategy of the sanitary specialist area welding, wall chasing and pipeline run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then dependable plumber near me works in sanitary arrangements are carried out according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below phase is assembling ceiling and laying tiles on the flooring. And at last other sanitary gadgets, mixers and devices are mounted.
After circuitry, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not set up throughout this stage in order to save their surface area look. The finish puttying of walls is carried out simultaneously. The technically specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines wetness of the material.

The following stage is the procedure of fill. Fill can be made with various products-- from normal masonry cement-sand mix to self-aligning floors. The advantage of the basic mixture is its cheapness, the downside is that such mixture is much more difficult lined up at the level and the final dry time of such fill is 40 days, only then the next phase of the work with floor can be carried out, i.e. the duration is too long. Self-leveling self-aligning floors are much more expensive, however more technological. Lining up occurs practically "immediately" i.e. fluid solution of mixture is put out, then it runs and you receive the horizontal surface. The final dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "wet procedures" are inapplicable the technology of the dry aligning (the fill technology) is utilized bases for floors with adjustable floor battens are mounted.
After fill door boxes and door are set up. Installation of doors need to take into the account density of future flooring covering. After installation the door can be taken off its hinges and got rid of up until completion of repair work or packed into polyethylene movie to secure from damages. All at once ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile must be laid on the absolutely dry overlay.
Finishing of the floor mounting depends upon the planned covering. For the most part (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to provide the close fixing of plywood and long-term service of the flooring without squeak and bulging. The plywood offers the additional heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.
In facilities where finish covering of the floor is laminated flooring or parquet hoard, the normal wallpapers are pasted (not for painting) in the very first place. Then the flooring covering is mounted.
If finish covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed consequence is linked only with such rushing procedure when the excellent amount of dust is produced. In spite of the fact that excellent floor grinders are geared up with the vacuum, the adequate quantity of dust is sped up on surrounding topics consisting of walls. Dust is extremely acerbic and is badly washed off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the primary works can be considered to be completed. It is left just to set up the plinths, decorative components, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is essential to note that the series of works was listed in general and can alter depending on the guaranteed circumstance-- the variety of rooms in premise, your resources, peculiarities of the building of the multilevel premises. It is based upon sound judgment and every person efficient in analysis can individually produce such a series.